RAILROAD MUSEUM PREPARES FOR FLOODING

RAILROAD MUSEUM PREPARES FOR FLOODING

51
SHARE

The Railroad Museum is preparing for flooding from the Big Sioux River this week.

Museum director Matt Merk says the museum at 3400 Sioux River road will be closed until July 1st as volunteers prepare for the expected flood:


OC….4 FEET IN ELEVATION. ;23

Merk expects a lot of water to come into the railroad museum grounds.


OC……LESS WATER. :13

If you would like to aid in the flood preparation or cleanup process after the water recedes, you may contact Matt Merk at (712) 253-7531.

Photo by George Lindblade